Eekay Epoxy Polyamide Finish
These are high performance TWO PACK EPOXY system especially formulated by using selected chemical resistant & weather resistant pigments. They form the finish coat in the heavy duty coating system for metal or masonry surface for exterior & interior use. It can also be used in the storage of chemicals of other Petroleum products.
Product Benefits
- Good water and humidity resistance.
- Anticorrosive and rust protective.
- Easy in application, brushing and sprying.
- Excellent adhesion over MS surfaces.
Product Features
- Washable with potable water.
- Excellent chemical resistance.
| Color | As per IS shade card / RAL shade card/ desired by the end user. |
| Finish | Glossy / Matt as desired |
| Flash Point | Above 25⁰C |
| Consistency | Smooth & uniform. |
| Pot Life | 4 – 6 hours |
| Mixing Ratio by Volume | 4: 1 By volume (BASE : HARDNER) |
| Dry film thickness | 22 – 25 microns per coat |
| Flash Point | > 24⁰C |
| Curing time | 7 days. |
| Drying time |
|
| Interval before over coating | 16 hours minimum |
| Method of Application | Spray / Brush / Roller Application |
| Thinner | Eekay EP Thinner |
| Covering Capacity | 8 - 10 sq meter / Liter / Coat |
Direction to use
- Surface preparation and substrate condition should be dry and free from all contaminations, surface to be sufficiently roughened prior to painting.
- Surface temperature must be atleast 10⁰ C and not more than 45⁰C.
Mixing
- If settling is observed in the drum, loosen the material with the help of hand stirrer, followed by power driven stirrer if needed.
- Mixing ratio 4:1 by volume (Base : Hardener)
| Application | Recommended Thinner | Volume of Thinner | Mixing ratio Base : Hardner by volume | Recoating Period |
| Sanding | Ensure the surface is thorough prepared as per the information given on pre painting steps. | |||
| Application of Eekay Epoxy Zinc Phosphate Primer 1st coat | Eekay EP Thinner |
|
|
Minimum 16 hours |
| Application of Eekay Epoxy Zinc Phosphate Primer 2nd coat | Apply a 2nd coat as per the above recommendation. A third coat may be required to ensure DFT build up. | Minimum 16 hours | ||
| Sanding | Light sand with emery paper no 320 and wipe clean. Apply the top coat as per the instructions given below. | |||
| Application of Eekay Epoxy Polyamide Finish | Eekay EP Thinner |
|
|
Minimum 16 hours |
| Sanding | Light sand with emery paper no 320 and wipe clean. Apply the top coat as per the instructions given above. | |||
Storage and Packing
- Store in cool and dry place.
- Store in accordance to local regulations.
- Packing will be made available in 1, 4 and 20 liters pack size.
Post Painting Care
- For the best performance of the paint, ensure proper washing and cleaning of all algal and fungal growth, if any at regular interval of 6 months.
Safety Information
- As a general measures, inhalation of solvent vapors, contact with eyes should be avoided.
- While application area should be well ventilated.
- In case of eye contact wash with plenty of clean water and take medical help if necessary.
- Use protective equipment’s like rubber / polyethylene gloves, safety goggles and face mask while handling the paint.