These are high performance TWO PACK EPOXY system especially formulated by using selected chemical resistant & weather resistant pigments. They form the finish coat in the heavy duty coating system for metal or masonry surface for exterior & interior use. It can also be used in the storage of chemicals of other Petroleum products.
Product Benefits
Good water and humidity resistance.
Anticorrosive and rust protective.
Easy in application, brushing and sprying.
Excellent adhesion over MS surfaces.
Product Features
Washable with potable water.
Excellent chemical resistance.
Color | As per IS shade card / RAL shade card/ desired by the end user. |
Finish | Glossy / Matt as desired |
Flash Point | Above 25⁰C |
Consistency | Smooth & uniform. |
Pot Life | 4 – 6 hours |
Mixing Ratio by Volume | 4: 1 By volume (BASE : HARDNER) |
Dry film thickness | 22 – 25 microns per coat |
Flash Point | > 24⁰C |
Curing time | 7 days. |
Drying time | Touch dry in 30 minutes. Hand able in 4 hours |
Interval before over coating | 16 hours minimum |
Method of Application | Spray / Brush / Roller Application |
Thinner | Eekay EP Thinner |
Covering Capacity | 8 - 10 sq meter / Liter / Coat |
Direction to use
Surface preparation and substrate condition should be dry and free from all contaminations, surface to be sufficiently roughened prior to painting.
Surface temperature must be atleast 10⁰ C and not more than 45⁰C.
Mixing
If settling is observed in the drum, loosen the material with the help of hand stirrer, followed by power driven stirrer if needed.
Mixing ratio 4:1 by volume (Base : Hardener)
Application | Recommended Thinner | Volume of Thinner | Mixing ratio Base : Hardner by volume | Recoating Period |
Sanding | Ensure the surface is thorough prepared as per the information given on pre painting steps. | |||
Application of Eekay Epoxy Zinc Phosphate Primer 1st coat | Eekay EP Thinner | By Brush 5% By Spray 5 – 10% |
4:1 Maturation time 20 – 30 min |
Minimum 16 hours |
Application of Eekay Epoxy Zinc Phosphate Primer 2nd coat | Apply a 2nd coat as per the above recommendation. A third coat may be required to ensure DFT build up. | Minimum 16 hours | ||
Sanding | Light sand with emery paper no 320 and wipe clean. Apply the top coat as per the instructions given below. | |||
Application of Eekay Epoxy Polyamide Finish | Eekay EP Thinner | By Brush 5% By Spray 5 – 10% |
4:1 Maturation time 20 – 30 min |
Minimum 16 hours |
Sanding | Light sand with emery paper no 320 and wipe clean. Apply the top coat as per the instructions given above. |
Storage and Packing
Store in cool and dry place.
Store in accordance to local regulations.
Packing will be made available in 1, 4 and 20 liters pack size.
Post Painting Care
For the best performance of the paint, ensure proper washing and cleaning of all algal and fungal growth, if any at regular interval of 6 months.
Safety Information
As a general measures, inhalation of solvent vapors, contact with eyes should be avoided. While application area should be well ventilated. In case of eye contact wash with plenty of clean water and take medical help if necessary. Use protective equipment’s like rubber / polyethylene gloves, safety goggles and face mask while handling the paint.
Ishwar Krupa, Chiplunkar road, Near Ramkrishna Hotel Chitaranjandas Road Ramnagar Dombivli (E)
+91 92214 61960 +91 97691 75577
Eekay Product & Co. | Developed By Sanmisha Technologies